Close Menu
  • ಮುಖಪುಟ
  • ಲೇಖನಗಳು
  • ಸಣ್ಣ ಕಥೆಗಳು
  • ವಿಮರ್ಶೆ
  • ಕವನಗಳು
  • ಸುದ್ದಿ
  • ನನ್ನ ಪಯಣ
    • ನನ್ನ ಕಿರು ಪರಿಚಯ
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
ಬೇಳೂರುಸುದರ್ಶನ
Subscribe
  • ಮುಖಪುಟ
  • ಲೇಖನಗಳು
  • ಸಣ್ಣ ಕಥೆಗಳು
  • ವಿಮರ್ಶೆ
  • ಕವನಗಳು
  • ಸುದ್ದಿ
  • ನನ್ನ ಪಯಣ
    • ನನ್ನ ಕಿರು ಪರಿಚಯ
ಬೇಳೂರುಸುದರ್ಶನ
You are at:Home»ಲೇಖನಗಳು»Shankar Sharma: Why Gundia Hydro Electric Project Is Not Needed
ಲೇಖನಗಳು

Shankar Sharma: Why Gundia Hydro Electric Project Is Not Needed

ಬೇಳೂರು ಸುದರ್ಶನBy ಬೇಳೂರು ಸುದರ್ಶನFebruary 18, 2010Updated:May 19, 2025No Comments18 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

An analysis of its deleterious impacts and benign alternatives for Karnataka

Synopsis: Karnataka Power Corporation Limited, Bangalore, a state govt. owned generating company, has submitted the Detailed Project Report (DPR) on Gundia Hydro Electric Project ( 2 * 200 MW capacity) for concurrence of Central Electricity Authority (CEA). While the Project Affected Families (PAFs) are strongly protesting the proposed project because of the serious impact on flora. Fauna and humans in that area, the state govt. has indicated that it will go ahead with the project against peoples’ concerns.  This article throws light on those issues which seem to have been conveniently omitted in the DPR.

Salient features of the project:

  • The project is planned in the rain forests, thick in vegetation, with very heavy rainfall area of Western Ghats of Hassan and Dakshina Kannada districts of Karnataka.
  • Not a multipurpose project: no flood control or irrigation. Only electricity generation proposed.
  • A high head power station (90 mts) of capacity 2 X 200 MW Units.
  • Anticipated generation: 1136 MU per year on a 90% dependable year.
  • Total cost of the project: Rs.1200 Crores; excluding that of R&R and forest land
  • Levellised tariff indicated: Rs.1.27/Unit.

Phase 1: Pooling up of water by linking smaller rivers Yettinahole, Kerihle, Hongadahalla and Bettakumeri through tunnels.  Water to be taken from the balancing reservoir to underground power house through a 7.8 kM underground headrace tunnel.  Water after generation of power goes back to Gondia River through a 3.1 kM long tailrace tunnel. Storage dam of 90 M height across Hongadahalla with a capacity of 132 million cum; 653 MU of electricity in the first phase.

Phase 2: Construction of two more tunnels bringing water from three more rivers through a 15 kM long tunnel. Additional 136 MU of electricity in the second phase.

Submersion of land: 489 Hectares of forest land; 10.2 hectares of garden land; 107.2 hectares of grass land; 101.6 hectares of agricultural land. Total 708 hectares. This is in addition to the forest land required for transmission lines, roads, quarries etc. required during the construction.  78 % of the total land required for the project is forest land, of which most is reserve forest land.

Controversial Statements in the DPR:

Few statements, which are not the correct reflection of the situation on the ground, are as follows: 

  • DPR states that the area is of thick forests with very heavy rainfall, but also says that the environmental impact of drowning 489 Hectares of forest land, 10.2 hectares of garden land, 107.2 hectares of grass land and 101.6 hectares of fertile agricultural land. is negligible.  
  • DPR talks of a run-off-river project in one section of the report, and also indicates that the project is conceptualized for peaking assistance in another section. The project envisages 100 % generation in July, less than 70% in June and August, less than 44% in Sept. and less than 20% in the remaining 8 months. It also proposes two reasonably big size dams for water storage. It is not clear as to how the same project can be envisaged to meet the role of both a run-off-river project and peaking station. The monthly generation indicated tells that this is envisaged basically as a peaking power station for a small percentage of time.
  • The DPR says that the degree of public participation and co-operation is as good. There has been continuous and stiff opposition to the project from the locals to such an extent that all the relevant Village Panchayats are known to have passed resolution against the project, and detailed survey of the land by the project proponents has not been allowed.
  • Details of transmission system and forest destruction due to it are not shown, and that data from Karnataka State Remote Sensing Applications Centre have been used. This may indicate that detailed survey on land has not been conducted.
  • DPR says that the forest land does not contain any rare or endangered species of plants. It is very strange that thick forests with very heavy rainfall in threatened Western Ghats do not contain any rare or endangered species of plants or animals.
  • 78 % of the total land required for the project is forest land, of which most is reserve forest land.  How can reserve forest land in a depleted forest region can be sought for the project? 

Why the project is not in the best interest of the state:

  1. As per the norms the no cost benefit analysis of this project has been shown by KPCL.  Without such an analysis the DPR has failed to demonstrate that the proposed project is the best solution available to the society in the present circumstances. 
  2. As a cursory look at the costs mentioned in the DPR indicates that the real costs to the society are very high compared to the meager benefits of 400 MW of peak load and annual energy of 1,136 MU at annual Load Factor of only 32.42%.  The costs of forest destruction and that of R&R of the Project Affected Families, which have not been included in the cost estimate, themselves may push the overall cost of the project to a high level.
  3. The value of the thick rain forests of highly sensitive Western Ghats alone, which are proposed to be submerged itself, may be many times more than the project cost of Rs. 1,200 Crores.
  4. The annual revenue to the forest department from this forest itself may be more than the monitory value of the energy estimated from the project. In addition, the real value of the livelihood it is providing to the locals, the value of herbs, of water source etc. will be very huge.
  5. Some of the value additions the thick rain forests of Western Ghats provide are: Production of oxygen; Control of soil erosion & maintenance of soil fertility; Recycling of water and control of humidity; Sheltering of animals, birds, insects & plants; Control of air pollution.
  6. It is reported that as per an indirect estimate of value of forests by Mathur and Soni in 1983 it is about 1.27 Crores per hectare per year. With about 490 Hectare of forests to be submerged under this project, the total value loss per year itself would work out to be about Rs. 620 Crore per year.      
  7. The value of annual energy production by this project @Rs. 1.27 per unit works out to Rs. 144 Crores. Even if we consider the replacement value of hydel energy by gas energy @ Rs. 4.00 per unit, the value of annual energy production by this project works out to be about Rs. 450 Crores.
  8. Whereas the revenue from a live forest is much more than that quantified above and is perpetual, the energy production from the proposed hydel station is only for a limited period say, maximum 50 years.
  9. Because of this simple economic analysis alone the project appears to be unviable when we take societal costs objectively.
  10. The project proponents have not considered any alternative to this project in order to meet the electricity demand of the state. Without deliberating on the alternatives, how do the project proponents know that this project is the most suited for the state at this juncture of time? Even if we agree for a minute that there is electricity shortage in the state, the first thing any company /organization would do under such a situation is to analyse the situation. One should ask the question why there has been shortage. If the officials care to analyse the situation objectively the following issues will become crystal clear.
  • The Transmission and Distribution losses in Karnataka have been very high of the order of about 30 against the international norms of less than 10%; if these losses are brought down to 10% there will be virtual addition of more than a thousand MW to the available power; this will be more than treble the capacity addition possible through the proposed project;
  • As of today the total available power for the state from various sources, including the share from the central sector is about 7,700 MW (as per MoP website).   If this capacity is used to the optimal level, (as per CEA norms about 10% is allowed for auxiliary consumption and unplanned outages), a peak hour demand of more than 6,500 MW can be easily met. But the peak hour demand met for the year 2005-06 was reported as 5,600 MW only. This shows that the infrastructure including the generating stations is not being put to maximum use.
  • Similarly, the annual energy deficit reported for the year 2005-06 was less than 1%.  Even if we take the unrestricted demand into consideration, which was not very high during 2005-06, the same for the reason mentioned above was easily avoidable;
  • In Karnataka there is huge scope for adopting various efficiency improvement measures like Demand Side Management (DSM) and utilization at users’ end.  As per the Planning Commission the peak load can be reduced by more than 10% at the national level. The replacement of even 50% of all the incandescent lamps in the state by CFL can result in the reduction of about 1,000 MW of peak hour demand, and about 1,500 MU of energy demand per year. This can be achieved without any expenditure to the state if the cost of replacement is passed on to the consumers in small installments.
  • The agricultural loads in the state, which are consuming about 40% of the total electrical energy of the state, are known to be wasting about 50% of this consumption which is techno-economically avoidable. Efficiency improvement in this sector alone can release about 20% of the total energy of the state for productive purposes, which is hidden in the system.
  • It is also a well known fact that the potential for the saving in non- agricultural loads in the state is huge. As per the Planning Commission such savings can be more than 20% of the total energy being consumed in the country.  At the state level this comes to about 15 to 20 % of the total energy of the state.
  • The potential available in the state for harnessing the new and renewable energy sources is immense. As per conservative estimates provided by the Ministry of new and renewable energy sources, more than 5,000 MW of production capacity is feasible from these sources.  The estimated potential of some of these measures are as in the table below.
  • In summary, an objective analysis of the present scenario of the electricity industry in the state will reveal that the deficit that has been experienced in the state for many decades is just due to the gross inefficiency in the system, and generally not due to the shortage in generating capacity.
  • Without objectively analyzing all these issues and taking the best course of action most suitable to our state, if the state encourages additional dam based stations it will not only lead to gross wastage of our resources, but will also lead to serious environmental and social issues.
  • A simulation study of the projected load pattern and the generation available in the state along with the already committed generation schemes has revealed that there would be surplus base load generating capacity by 2015, and such a situation would lead to an average PLF of the thermal power stations of about 30%.
  • The state is already having about 50% of the total power availability through hydro capacity. So even from the system operation point of view this additional hydro power station is not essential.
  • All these issues clearly establish that the ideal solution to the artificial power deficit being faced by the state is not going to be the blind addition of dam based power stations.

 The best solution of relevance to our state is a good combination of measures like peak industry efficiency, optimal Demand Side Management, practical level of energy conservation, and maximum deployment of new and renewable energy technologies.  These measures, some of which are enumerated in the table in section 10 above, will ensure the electricity supply security on a sustainable basis at the least overall cost to the society.

 Forestry and Environmental Issues

The following are additional concerns expressed by a retired officer of the Indian Forest Service on Rapid Environmental Impact Assessment (REIA) / Environmental Management Plan (EMP) submitted by KPCL. 

  • The legal status of forest land (774.26 ha) and grass land (107.21ha) as stated in the DPR are not clear. It should be mentioned either as Reserved Forests or as Revenue lands. Land value differs for each category. If it is a RF then compensatory afforestation has to be done in non- forest lands of equal extent identified by government. The cost per ha is about Rs. 50,000-00 per ha. This has to be paid by KPCL to Forest department.
  • In addition, environment value at the rate of Rs. 124.00 lakhs per hactare has to be paid by the beneficiary to government.
  • Supreme Court has fixed forest value/growth (Net present value) for tropical Evergreen forests like that of Gundia Reserve Forests at Rs. 9.20 lakhs per ha and has to be paid by the beneficiary to government.  
  • No forest land will be released for rehabilitation purposes (KPCL has earmarked 5 hectare for this purpose) as per recent guidelines of GoI.
  • There is no identified safe site for land fill, as it is expected to dump about 36.00 lakh cum of rock muck and there is no comment on their impact. 40 ha of forest area are indicated as required but the government of India has made it clear that no forest land should be used for such activity.
  • The project site is covered on all sides by protected areas, like Pushpagiri, Brahmagiri and Kudremukh sanctuaries and therefore movement of wild animals like elephants will be expected. If their corridors are blocked, the man animal conflict, crop damage etc will increase. Therefore it is not insignificant as indicated in the REIA.
  • Rehabilitation and Resettlement cost has to be included in the project cost for calculating Benefit / Cost ratio. The project affected families may accept money as compensation but may encroach other forested areas and therefore equal extent of land from non forest areas may be considered for resettlement. 
  • Green felling in forest areas are banned by government and therefore it is not possible to earmark 1 ha of forest every year for fuelwood, as indicated in DPR. The contractor has to provide alternate energy sources like gas, fuelwood depot, bio gas, wind energy etc. It is difficult to assess the real impact of labours as several other activities like shops, houses etc are bound to increase in the project area.
  • The loss of forest cover as stated in DPR, is 1.93% in Sakaleshapur taluk only, and not the total forest cover after release.
  • During the floral studies, only economically important timber species are considered and listed. The area is important for non-timber forest products including medicinal plants and detailed floral and faunal studies should be carried out.
  • Western Ghats is an important and sensitive ecological area in the world, and already several hydro electric projects, mining, road and rail have destroyed these unique forest ecosystems reducing the natural forests. It is very pertinent to note that any EMP will not be able to compensate the loss of bio diversity.

 

Additional power options available for Karnataka system

        Technique         Basis of savings     Estimated Potential for

     savings

R, M & U of existing

Hydro generating stations

5-8% of 2,300 MW of hydro capacity 160 MW / 800 MU
T&D loss reduction Present loss level is about 30%; can be

reduced to 10%; 20% of a base of

5,500 MW and 34,300 MU energy 

1,100 MW /  7,000 MU
Utilisation loss reduction –

non-agricultural

20% savings assumed feasible on a

base of 5,500 MW and 21,600 MU

(63% of energy demand met in

2005-06 ie. 34,300 MU)

1,100 MW / 4,300 MU
Utilisation loss reduction –

agricultural

40% energy consumption savings

deemed feasible in each of the 50%

of the IP sets; on energy base of

12,700 MU (37% of 34,300 MU)

Nil peak demand savings

and 2,500 MU energy

Wind energy 600 MW from the potential of 1,180

MW assumed feasible; PLF of 40%

assumed

600 MW /2,100 MU
Biomass 50% of estimated potential of 950 MW is assumed feasible at a PLF of 50%. 480 MW / 2,000 MU
Solar – Water heating Assumed 75% of 14 lakh installations

can be fed at average load of 2kW; at an average use of 1.5 hour a day assumed

2,100 MW during morning

Peak and 1050 MW during

Evening peak / 1,100 MU

Solar –residential lighting Assumed 25% of 81 lakh installations can be fed; average load of 160 Watts and

average 5 hrs a day energy consumption

300 MW / 600 MU
Solar – water pumping for

IP sets

Assumed 25% of 15 lakh installations

can be fed; at 3 kW average load this

comes to about 1199 MW; 25% of the

total savings in demand assumed for

evening peak hours;

1100 MW /

3,200 MU energy

Solar – Public and

commercial

lighting

Assumed 40% of 11 lakh installations (with 1,600 MU annual consumption) can be fed; average load of 100 Watts

Assumed.

40 MW / 640 MU

 Conclusions:

Taking all these facts into consideration the energy experts of the state are of the view that such dam based power stations are not in the best interest of the state, and hence should be rejected.  The Western Ghats in the state, which are identified as 18 most important bio-diversity hotspots in the world by UN, have already been subjected to massive abuse in the name of various so called ‘developmental projects’.  Most of the hydro electric projects of the state (about 3,000 MW out of the installed hydel capacity of about 3,500 MW) are in Western Ghats. The destruction, submersion and fragmentation of the Western Ghats due to hydel projects alone have been so massive so far that its sensitive ecology has been irreversible damaged.

 The Western Ghats in Karnataka are the source of about 30 small and major rivers including Cauvery, Tunga, Bhadra, Sharavaty, Netravthy, Hemavathy etc. and are the main sources of water in the plains, in addition to being the life line of people of the state.  In this scenario any more destruction, submersion and fragmentation of the Western Ghats will be suicidal, and hence the proposed Gundia hydro electric project is not in the best interest of the people of not only Karnataka but also of the entire South India.

 Without optimally utilizing the existing generation and transmission capacity in the state, to pour money into such high impact projects at a time when there any number of expert reports providing early warning on Global Warming (recent ones are the ‘Economics of Climate Change’ by British Parliament, and an economic review of the same by Sir. Nicholas Stern) will be a disaster for our society.  Such unsubstantiated spending will be seen by many people as misuse of the public fund, especially when other priority sectors like poverty alleviation, health, education etc. are crying for more budgetary support.

 The Integrated Energy Policy by the Planning Commission says: “From a longer term perspective we need to relentlessly pursue the energy efficiency and energy conservation as the most important virtual source of domestic energy”.  Energy efficiency is one of the EU’s answers to the double challenge of global warming and increasing energy dependency on oil and gas. As per WorldWatch Institute alternative ways of generating energy with little or no carbon emissions, improvements in energy efficiency and using less energy overall will all be needed on a massive scale.

 There is a clear need for adopting a paradigm shift on our energy policy.  KPCL should consider investing judiciously in more advantageous and benign alternatives to meet the power/energy demand of the state.  It will be in the overall interest of the state and the region as a whole that such high impact project proposals such as hydel project across rivers Gundia, Bedthi, Aghanashini, Barapole etc. or coal fired power station proposals in Nandikur, Tadadi, Mysore, Hassan etc. are viewed objectively in this background, and discontinued with.

 The all important and sensitive Western Ghats, pristine coastal Karnataka, and serene plains of Karnataka must be protected adequately for a sustainable living not only for the present generation but also for future generations.  The present generation has a vast responsibility in this regard.

gundia mitramaadhyama netravathy shankar sharma
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleImpact of Electric Power Sector on Western Ghats : Issues and remedies
Next Article ಹೀಗಿದ್ದರು ನಾನಾಜಿ ದೇಶಮುಖ್
ಬೇಳೂರು ಸುದರ್ಶನ
  • Website

Related Posts

ಬಿಟ್ಟ ಕೆಲಸಕ್ಕೊಂದು ಸ್ಮರಣಿಕೆ; ಅದೇ ಬದುಕಿನ ಹೆಜ್ಜೆಗಳ ಎಣಿಕೆ!  

May 27, 2024

ಮಾನ್ಯ ಮುಖ್ಯಮಂತ್ರಿಯವರ ಇ – ಆಡಳಿತ ಸಲಹೆಗಾರನಾಗಿ ಒಂದು ವರ್ಷ: ಚಟುವಟಿಕೆಗಳ ಸಂಕ್ಷಿಪ್ತ ವರದಿ

October 27, 2020

www.ಬೇಳೂರುಸುದರ್ಶನ.ಭಾರತ : ಕನ್ನಡ ಯು ಆರ್‌ ಎಲ್‌ ನ ಬ್ಲಾಗ್‌ ಗೆ ಸ್ವಾಗತ

July 17, 2020

Comments are closed.

ಲೇಖನಗಳು, ಶಂಕರ್ ಶರ್ಮ
  • ಬಿಟ್ಟ ಕೆಲಸಕ್ಕೊಂದು ಸ್ಮರಣಿಕೆ; ಅದೇ ಬದುಕಿನ ಹೆಜ್ಜೆಗಳ ಎಣಿಕೆ!  
  • ಮಾನ್ಯ ಮುಖ್ಯಮಂತ್ರಿಯವರ ಇ – ಆಡಳಿತ ಸಲಹೆಗಾರನಾಗಿ ಒಂದು ವರ್ಷ: ಚಟುವಟಿಕೆಗಳ ಸಂಕ್ಷಿಪ್ತ ವರದಿ
  • www.ಬೇಳೂರುಸುದರ್ಶನ.ಭಾರತ : ಕನ್ನಡ ಯು ಆರ್‌ ಎಲ್‌ ನ ಬ್ಲಾಗ್‌ ಗೆ ಸ್ವಾಗತ
  • ಕನ್ನಡ ಗ್ರಂಥ ಸಂಪಾದನೆ ಮತ್ತು ತಂತ್ರಜ್ಞಾನ
  • ಅನುವಾದ: ಹೊಸ ಆಯಾಮಗಳು, ಬದಲಾಗುತ್ತಿರುವ ವೃತ್ತಿ ಚಹರೆಗಳು – ಕೆಲವು ಟಿಪ್ಪಣಿಗಳು
  • ಕೊರೋನಾ ಕಾಲದಲ್ಲಿ ಪೋಲಿಯೋ ಕತೆ ಮತ್ತು ಬೆಳಂಬಾರ ಬೊಮ್ಮು ಶಿವು ಗೌಡರ ಯಶಸ್ವೀ ಸಸ್ಯಚಿಕಿತ್ಸೆ
  • ಪೆನ್‌ ಫ್ರೆಂಡ್‌: 32 ವರ್ಷಗಳ ಹಿಂದಿನ ಹುಚ್ಚು ಪ್ರಯತ್ನ
  • ಕನ್ನಡ ತಂತ್ರಜ್ಞಾನದಲ್ಲಿ ಅಳವಡಿಕೆಯ ಸಮಸ್ಯೆಗಳು
  • ದಣಿವರಿಯದ ಸಾಫ್ಟ್‌ವೇರ್‌ ಸಂಘಟಕ ಎಂಪಿ ಕುಮಾರ್‌ಗೆ ಇದು ವಿದಾಯವಲ್ಲ, ಹೊಸ ಆರಂಭ !!
  • ಪದಬ್ರಹ್ಮ ‘ನಾಣ’ ಮತ್ತು ಆಶುಕವನ!
  • The relevance of nuclear power from Climate Change perspective: A letter to Hon’ble Vice President of India
  • ನಾನೂ ಜವಹರಲಾಲ್‌ ನೆಹರು ವಿವಿಯಲ್ಲಿ, ಅಂತಾರಾಷ್ಟ್ರೀಯ ಸಮ್ಮೇಳನದಲ್ಲಿ ತಾಂತ್ರಿಕ ಪ್ರಬಂಧ ಮಂಡಿಸಿದೆ!
  • ನನ್ನಲ್ಲೊಬ್ಬ ವಿಮಲಾ: ದಿಕ್ಕೆಟ್ಟ ಹುಡುಗನಿಗೆ ಬಾಳು ಕೊಟ್ಟವಳು! (ಖಾಸಗಿ ಬ್ಲಾಗ್‌)
  • ಭಾರತ ಭೂಖಂಡದ ಹುಟ್ಟು ಗುಟ್ಟು ಒಡೆದ ಅಪೂರ್ವ ಕಥಾನಕ: ಇಂಡಿಕ
  • Tesseract 4.0 OCR (Optical Character recognition Software) : A real game changer? (Also read a layman’s guide to use Tesseract!)
  • ಅನಂತಕುಮಾರ್‌: ಒಂದು ಖಾಸಗಿ ನಮನ
  • Sardar Patel Memorial Speech by Beluru Sudarshana
  • ಕೊಡಗು ನೆರೆ ದುರಂತದ ಹಿನ್ನೆಲೆಯಲ್ಲಿ ಸುಸ್ಥಿರ ಕ್ರಿಯಾಯೋಜನೆ ರೂಪಿಸಲು  ಮಿತ್ರಮಾಧ್ಯಮದ ಒತ್ತಾಯ
  • ತುಂಟ ಸಿದ್ಧಾರ್ಥ: 2ನೇ ಕ್ಲಾಸಲ್ಲಿ ಕಲಾವಿದ, ಎಸೆಸೆಲ್ಸೀಲಿ ವಿಜ್ಞಾನಿ!
  • Solar water pumps can help India surpass 100 GW target through Kisan Urja Suraksha Utthaan Maha Abhiyan
  • Shankar Sharma’s Blog: Serious implications of the proposal to supply water from Linganamakki to Bengaluru, and other ghastly projects (resulting in cutting of 12.75 lakh trees)
  • ಹವಾಗುಣ ಕುಸಿತದ ಬಗ್ಗೆ ಜನಜಾಗೃತಿಗೆ ವಿಶ್ವದಾಖಲೆಯ 23 ಸಾವಿರ ಕಿಮೀ ಸೈಕ್ಲಿಂಗ್‌!
  • ಸ್ಥಳೀಯತೆಯೇ ಬದುಕು, ಅದರಲಿ ತೃಪ್ತಿಯ ಹುಡುಕು!  
  • ಪಿಯೆರೆ ಒಮಿಡ್ಯಾರ್ ದಾನಪಾಶ: ಅಲಿಪ್ತ ಮಾಧ್ಯಮದ ಸರ್ವನಾಶ
  • Attention NGOs: Transparency and probity begins from you!
  • ಕರ್ನಾಟಕ ಸರ್ಕಾರದ ಜಾಲತಾಣಗಳಲ್ಲಿ ಕನ್ನಡ ಬಳಕೆ, ಶಿಷ್ಟತೆ, ಏಕರೂಪತೆ ಮತ್ತು ಸುಲಭಗ್ರಾಹ್ಯತೆ (ಕನ್ನಡ ಅಭಿವೃದ್ಧಿ ಪ್ರಾಧಿಕಾರಕ್ಕೆ ಸಲ್ಲಿಸಿದ ವರದಿ )
  • ಹಳೆ – ಹೊಸ ಮಾಧ್ಯಮಗಳಲ್ಲಿ ಮುಕ್ತ ಜ್ಞಾನದ ಸಾಧ್ಯತೆಗಳು
  • Digital life : let us make it sustainable; minimise carbon footprints
  • ಕನ್ನಡದ ಉಳಿವಿಗೆ ಒಂದೇ ಹಾದಿ: ಮುಕ್ತ ಜ್ಞಾನ, ಮುಕ್ತ ತಂತ್ರಜ್ಞಾನ
  • Requiem for the desktop PC? Not yet!
  • The heaven created by trinity of Hindustani music turns 50!
  • ಕನ್ನಡ ಡಿಟಿಪಿ: ಯುನಿಕೋಡ್‌ಯುಕ್ತ ಸ್ಕ್ರೈಬಸ್‌ ಸ್ವಾಗತಿಸಿ! ಈಗಲಾದರೂ ಹಳೆ ಫಾಂಟ್‌, ತಂತ್ರಾಂಶಗಳನ್ನು ಕಿತ್ತೊಗೆದು ಹೊಸಕಾಲದ `ಡಿಜಿಟಲ್‌ ಜಗಲಿ’ ಕಟ್ಟೋಣ.
  • ಒಂದು ವರ್ಷದ ಹೊಸ್ತಿಲು ದಾಟಿದ `ಭಾರತವಾಣಿ’ : ಭಾರತೀಯ ಭಾಷೆಗಳ ಹಿರಿಮೆಗೆ ನನ್ನ ನಮನ!
  • ಸುಲ್ತಾನ್‌ ಖಾನ್‌ ಸಾರಂಗಿಯ ನಶೆ ಇಳಿಯುವುದಾದರೂ ಹೇಗೆ?!
  • ಮೈ ಚ ಜ : ಕಟುಮಧುರ ವಜ್ರಕಾಯ, ದಣಿವರಿಯದ ದೇಶಕಾರ್ಯ
  • ಸಂಸ್ಕೃತ ಸಂವರ್ಧನವೇ ನನ್ನ ಮುಂದಿನ ಹೆಜ್ಜೆ : `ಪದ್ಮಶ್ರೀ’ ಪ್ರಶಸ್ತಿ ಪುರಸ್ಕೃತ ಶ್ರೀ ಚ ಮೂ ಕೃಷ್ಣಶಾಸ್ತ್ರಿ
  • `ಚಿತ್ರ-ಕವನ’ ಸ್ಪರ್ಧೆಯಲ್ಲಿ ಅಪ್ಪಟ ಸ್ನೇಹವೇ ಬಹುಮಾನ!
  • The Lefts I respect in my life
  • ನವ ಲಿಬರಲ್‌ಗಳ ನಕಲಿ ಬದುಕು!
  • ಪರಮಾಣು ಹುಣ್ಣಿನ ಫುಕುಶಿಮಾ ಹೇಗಿದೆ? ಬ್ಲಾಗ್‌ ಓದಿ, ಹೊಸ ಸಾಕ್ಷ್ಯಚಿತ್ರ ನೋಡಿ!
  • ನಿಮ್ಮ ರೋಗ ಚಿಕಿತ್ಸೆಗೆ ನೀತಿವಂತ ವೈದ್ಯರನ್ನು ಹುಡುಕಲು ಇಲ್ಲಿಗೆ ಬನ್ನಿ!
  • Are we above Supreme Court?
  • ಬೇಳೂರು ಬ್ಲಾಗ್‌ ವಿಶೇಷ: ಬ್ರಹ್ಮಾಂಡದ ಈಗಿನ ಸಿದ್ಧಾಂತವನ್ನು ಶ್ರೀನಿವಾಸ ರಾಮಾನುಜನ್‌ ಅಂದೇ ಗುರುತಿಸಿದ್ದರೆ?
  • ಆಲಿಯಾ ರಶೀದ್‌: ಪಾಕಿಸ್ತಾನದ ಪ್ರಥಮ – ಏಕೈಕ ಧ್ರುಪದ್‌ ಗಾಯಕಿ; ಒಳಗಣ್ಣಿನ ಅಧಿನಾಯಕಿ
  • `ಸಾರ’ ಯಂತ್ರಾನುವಾದ ಬಳಸಿ! ಸೆಕೆಂಡಿಗೆ ಲಕ್ಷ ವಾಕ್ಯ ಕನ್ನಡದಿಂದ-ತೆಲುಗಿಗೆ ಅನುವಾದಿಸಿ!
  • ಹೊಸನಗರದ `ಕಾನಿ’ನಲ್ಲಿ ಹೊಸಾ ಜೇಡ ! ಘಟ್ಟಸಾಲಿನಲ್ಲಿ ಜೀವಜಾಲ ನೋಡಾ!   
  • ಮಾತೃಭಾಷೆಯಲ್ಲಿ ಮುಕ್ತಜ್ಞಾನದ ಸಾಧ್ಯತೆಗಳು : ಬನ್ನಿ, `ಅರಿವಿನ ಗೋಮಾಳ’ದ ಚಳವಳಿಯತ್ತ ಮುನ್ನಡೆಯೋಣ!
  • My Bansuri Guru, friend, guide and philosopher
  • Kick-starting the linguistic revolution
  • ಖಾಸಗಿ ಮಣೆ ಮೇಲೆ ಸ್ವಾತಂತ್ರ್ಯದ ಪ್ರಲಾಪ!
  • ಒಡೆದ ಗುಟ್ಟಿನ ಗೂಡು…..
  • ಬೇಯರ್ – ಮೊನ್ಸಾಂಟೋ ವಿಲೀನ ವಿಚಾರ: ವಿಷಗುಡಾಣದಲ್ಲಿ ಬೀಜಬಿಡಾರ
  • ಬನ್ನಿ, ಬದುಕೋಣ!
  • ಬರಲಿವೆ ಕೀಟಖಾದ್ಯ!
  • ಐಟಿ ಸಾಧನಗಳಲ್ಲಿ ಭಾ಼ಷೆ, ಲಿಪಿ: ಭಿಕ್ಷೆಯಲ್ಲ, ಹಕ್ಕು
  • ರಾಖಿಗಢಿ: ಸಿಂಧೂ ಕಣಿವೆಯ ಬೃಹತ್ ತಾಣ – ಇನ್ನಾದರೂ ನಿಜ ಇತಿಹಾಸ ಬರೆಯೋಣ!
  • Prashant Kishor : Disruptive, Harmful
  • Shankar Sharma: India’s Ongoing Water and Power Crises
  • ಕರ್ನಾಟಕದಲ್ಲಿ ಪ್ಲಾಸ್ಟಿಕ್‌ ನಿಷೇಧ: ಶಾಸನ ಅರೆಬರೆ, ತಳಮಟ್ಟದ ಜನತೆಗೆ ಬರೆ
  • ರಾ.ಸ್ವ.ಸಂಘ: ೯೦ರ ಹಿರಿತನಕ್ಕೆ ಗೌರವಪೂರ್ವಕ ನಮನಗಳು, ಹಾರ್ದಿಕ ಶುಭಾಶಯಗಳು
  • `ನನ್ನ ದೇಹ ಗ್ಯಾರೇಜಿನಲ್ಲಿದೆ’ ಎಂದು ಬರೆದಿಡಲು ನಿನಗೆ ಸಾಧ್ಯ ಆಗಿದ್ದಾದರೂ ಹೇಗೆ ರಾಬಿನ್‌?
  • ನಾನು ಅಕಾಡೆಮಿ ಪ್ರಶಸ್ತಿಯನ್ನು ಹಿಂದಿರುಗಿಸುವುದಿಲ್ಲ; ಏಕೆಂದರೆ…
  • ಇಲಾನ್ ಮಸ್ಕ್ : ಮನುಕುಲ ಏಳಿಗೆಯ ಮಹಾನ್ ಕನಸುಗಾರ; ಹೈಟೆಕ್ ವಿಜ್ಞಾನಿ, ಹೂಡಿಕೆದಾರ; ಮುಕ್ತ ತಂತ್ರಜ್ಞಾನದ ಹರಿಕಾರ
  • ೪೭ ಮತ್ತು ೫೩ ಪ್ರೈಮ್‌ ಸಂಖ್ಯೆಗಳ ನಡುವೆ ೫೦ ಏನು ಮಹಾ?
  • ಅಗಣಿತ ತಾರಾಗಣಗಳ ನಡುವೆ ಕೇಸರ್‌ಬಾಯಿ ಕೇರ್‍ಕರ್‌ ಹಾಡಿನ ಅಲೆ
  • ನೀರು, ನೀರಾವರಿ: ಪರಂಪರೆಯಲ್ಲೇ ಪರಿಹಾರ ಇದೆ ಕಣ್ರೀ!
  • ರಾಜಕೀಯ ಪ್ರವೇಶಿಸಿದ ಎನ್‌ ರವಿಕುಮಾರ್‌ ಬೆಳೆದ ಕಥೆ ಇಲ್ಲಿದೆ!
  • ಖಾಸಗಿ ಕಾಲಂ: ನನ್ನ ಮಗನ ಕಲಿವ ತವಕ!
  • ಕೇಂದ್ರ ಸರ್ಕಾರದ ಹೊಸ ಜೈವಿಕ ಇಂಧನ ಕಾರ್ಯತಂಡದ ಅಧ್ಯಕ್ಷರಾಗಿ ವೈ ಬಿ ರಾಮಕೃಷ್ಣ ನೇಮಕ
  • ವಿಜ್ಞಾನ ವಿಷಯಗಳನ್ನು ವರದಿ ಮಾಡುವುದು ಹೇಗೆ?
  • ವಿಶ್ವ ಪರಿಸರ ದಿನ ೨೦೧೫: ಲಾಂಛನ ರೂಪಿಸಿದವರು ಕೇರಳದ ಶಿಬಿನ್‌; ಇಲ್ಲಿದೆ ಅವರ ವಿಶೇಷ ಸಂದರ್ಶನ!
  • ಭವಿಷ್ಯದ ಕಾರಿಗೆ ಭದ್ರ ಬೆಸುಗೆ
  • ಅರಾಸೇ ಇನ್ನಿಲ್ಲ! ನನ್ನ ಹತಾಶೆಯ ದಿನಗಳಲ್ಲಿ ಶಕ್ತಿ ನೀಡಿದ ಚೇತನಕ್ಕೆ ನಮೋನ್ನಮಃ 
  • ಪರಿಸರ ರಕ್ಷಣೆಗೆ ಮುಂದಾದ `ದಿ ಗಾರ್ಡಿಯನ್‌’ ನಮಗೆ ಮಾದರಿಯಾಗಲಿ
  • ಹವಾಗುಣ ವೈಪರೀತ್ಯದ ಪರಿಣಾಮ: ಭಾರತದಲ್ಲಿ ಬೇಸಗೆ ಮಳೆ ತಂದ ಕೃಷಿ ದುರಂತ
  • ಸೆನ್ಸಾರ್‌ ಬೋರ್ಡ್ ಬೇಕು ಕಣ್ರೀ: ಸಿಟಿಂಗ್‌ ಫೀ ಮುಕ್ಕಿದ ಮಾಜಿ ಸದಸ್ಯನ ನೀಚ ಹೇಳಿಕೆ
  • ಇಂಟರ್‌ನೆಟ್‌.ORG : ಬಹು ಬಹು ರಾಷ್ಟ್ರೀಯ ಸಂಸ್ಥೆಗಳ (MMNC) ಸಂಘಟಿತ ಮಾರುಕಟ್ಟೆ ಜಾಲ
  • ಕನ್ನಡ ಓಸಿಆರ್‌ ಸಭೆಯಲ್ಲಿ ನಾಲ್ಕು ತಂತ್ರಾಂಶಗಳ ಯಶಸ್ವೀ ಪ್ರಾತ್ಯಕ್ಷಿಕೆ
  • ಗಾಳಿ ಪಳಗಿಸಿದ ಬಾಲಕ: ಕನ್ನಡ ಪ್ರಕಾಶನ ಹಾದಿ ಬದಲಿಸುವ ರೋಚಕ ಪುಸ್ತಕ
  • ೧೯೮೭ರ `ಉತ್ಥಾನ’ದ ಲೇಖನ: ಬೇವು – ಕೃಷಿಕರ ಕಲ್ಪವೃಕ್ಷ
  • ಕನ್ನಡ ಓಸಿಆರ್‌ ಸಭೆಯಲ್ಲಿ ಭಾಗವಹಿಸಲು ಕನ್ನಡ ಐಟಿ ತಂತ್ರಜ್ಞರು, ಸಮುದಾಯ ಐಟಿ ಕಾರ್ಯಕರ್ತರಿಗೆ ಮುಕ್ತ ಆಹ್ವಾನ!
  • 1987ರ ಲೇಖನ: ಚಿರಂತನ ಶಕ್ತಿ
  • ನಿರುದ್ಯೋಗವೆಂಬ ಬೇತಾಳವನ್ನು ಇತ್ತೀಚೆಗೆ ಭೇಟಿ ಮಾಡಿದ ಒಂದು ಕ್ಷಣ
  • Mitramaadhyama Appeals To Ananthkumar To Release Kannada OCR Developed By Mile Lab, Iisc, Bengaluru To The Usage Of General Public As A Open Software Tool
  • ಶೌಚಾಲಯ ಕ್ರಾಂತಿ: ಡೆಡ್‌ಲೈನ್ ಮುಗಿದಿದೆ!
  • ಕನ್ನಡ ಮತ್ತು ಮಾಹಿತಿ ತಂತ್ರಜ್ಞಾನ : ದುಂಡುಮೇಜಿನ ಸಭೆ ಕರೆದು ಚರ್ಚಿಸಿ, ಸಮುದಾಯ ಭಾಗಿತ್ವ ಆರಂಭಿಸಿ
  • IT revolution and Regional Newspapers: Let’s harness it!
  • ಕೌಶಲ್ಯ ಅಭಿವೃದ್ಧಿ: ಮಿತ್ರಮಾಧ್ಯಮ ಸಮೀಕ್ಷೆಯಲ್ಲಿ ಭಾಗವಹಿಸಿ! | PARTICIPATE IN SKILL DEVELOPMENT SURVEY!
  • ಎಲ್ಲ ಅಕ್ಷರಗಳನ್ನು ಪ್ರೀತಿಸೋಣ, ಎಲ್ಲ ಭಾಷೆಗಳನ್ನೂ ಪ್ರೀತಿಸೋಣ : ಕೆ ಪಿ ರಾವ್‌
  • ನನ್ನ ಮಾವ ಗೋವಿಂದರಾಯರು: ಒಂದು ಖಾಸಗಿ ನಮನ
  • ಗೋಪಿನಾಥ್‌ ಮುಂಧೆ: ಒಂದು ದಿನದ ಸ್ನೇಹಯಾನ
  • ರಾಷ್ಟ್ರೀಯ ಆಹ್ವಾನ ಸಿಕ್ಕಿದೆ: ಪಂಥಾಹ್ವಾನ ಮುಂದಿದೆ!
  • ನದೀಕಣಿವೆಯ `ಟೆಕ್’ ಸಂತನೊಂದಿಗೆ ಅರ್ಧ ದಿನ
  • ಹಸಿವಿನ ಈ ಮೂರು ನೆನಪುಗಳಲ್ಲಿ ತುಂಬಾ ಪೌಷ್ಟಿಕತೆ ಇದೆ!
  • ಈಮೈಲ್‌ ಜನಕ `ಶಿವ ಅಯ್ಯದೊರೈ’; ಇನ್ನುಮುಂದೆ `ರೇ ಟೋಮಿಲ್‌ಸನ್‌’ ಎನ್ನದಿರೈ!
  • ಬರಲಿವೆ ಜ್ಯೋತಿಸ್ತಂತುಗಳು ( ಆಪ್ಟಿಕಲ್‌ ಫೈಬರ್‌ ಬಗ್ಗೆ ೧೯೮೭ರಲ್ಲಿ ಬರೆದ ಲೇಖನ!)
  • SHANKAR SHARMA: CREATION OF A SUSTAINABLE URBAN ENERGY SYSTEM
  • ಮಿತ್ರಮಾಧ್ಯಮ ವಿಶೇಷ: ಫೋನ್‌ ಬ್ಲಾಕ್‌ ಕ್ರಾಂತಿಗೆ ಇನ್ನೆರಡೇ ವರ್ಷ!
  • Book Review: THE THIRD CURVE – The End of Growth as we know it: A Must Read for Energy Policy Makers
  • Shankar Sharma: Environmentalists to support the development of safer nuclear power as one way to cut fossil fuel pollution? Some serious concerns
  • Dave’s Phone Blok – Invention takes digital world by storm
  • ನಾವೇಕೆ ವಿಷಮಯವಾಗಬೇಕು? ಮಾನವ ನಿರ್ಮಿತ ರಾಸಾಯನಿಕಗಳ ಬಗ್ಗೆ ಮುನ್ನೆಚ್ಚರಿಕೆಯ ಹೆಜ್ಜೆಗಳು [ಪುಸ್ತಕ]
  • ಸ್ಲೇಟು-ಬಳಪದ ಹೊಸ ಯುಗಕ್ಕೆ ಸ್ವಾಗತ !
  • ಆರು ಸೆಕೆಂಡಿಗೊಂದು ಸಾವು: ಕಟುಸೌಜನ್ಯ – ತಂಬಾಕು
  • ತಟ್ಟಿಹಳ್ಳ: ಜಡಿಮಳೆಗೂ ಸವಾಲೊಡ್ಡಿದ ಜೈವಿಕ ಇಂಧನ ಸಸಿನಾಟಿ ದಾಖಲೆ
  • ಬ್ಲಾಗಾಯತ : ಸುದ್ದಿ, ಬದುಕು, ಭಾವನೆಗೆ ಹೊಸ ಆಕಾರ
  • Coal Blooded-Putting Profits Before People
  • ಗಶ್‌ಶ್‌ಶ್‌ಶ್‌ಶ್!! ರೇಡಿಯೋದಲ್ಲಿ ಪಾಠದ ಪುಟ ಬರ್‍ತಾ ಇದೆ!
  • Integrated Power Policy: Download the book here!
  • 'ಇಂಟೆಗ್ರೇಟೆಡ್‌ ಪವರ್‌ ಪಾಲಿಸಿ' ಶಂಕರಶರ್ಮ ಪುಸ್ತಕ ಬಿಡುಗಡೆಗೆ ಬನ್ನಿ! (ಅಕ್ಟೋಬರ್‌ ೧೦)
  • Shankar Sharma: Feedback on National Electricity Plan on Generation – 12th & 13th Plan periods
  • ಜಜಂತರ್‌ ಮಮಂತರ್‌ ಮ್ಯಾಗಜಿನ್‌ನ ೨ನೇ ಸಂಚಿಕೆ : ಸ್ಥಾವರಕ್ಕಳಿವುಂಟೆ?
  • ಜಂತರ್‌ ಮಂತರ್‌: ಮಿತ್ರಮಾಧ್ಯಮದ ವಿಜ್ಞಾನ ಸಂಚಿಕೆ ೧
  • ಮಾರಿಯಾನಾ ಜಲಕಮರಿಯಿಂದ ಕೇಳಿ ಬಂದ ದನಿಗಳು
  • ಕೂಡಿಗಿ ಕಲ್ಲಿದ್ದಲು ಶಾಖೋತ್ಪನ್ನ ವಿದ್ಯುತ್‌ ಸ್ಥಾವರದಿಂದ ಲಾಭವಿದೆಯೆ?
  • ಒಂದೇ ಸಹಜ ಧ್ವನಿಯಲ್ಲಿ ರಿಯಲ್‌ ಟೈಮ್‌ ಭಾಷಾಂತರ: ಮೈಕ್ರೋಸಾಫ್ಟ್‌ ನ ಮಹತ್ವದ ಸಂಶೋಧನೆಯನ್ನು ಅಭಿನಂದಿಸೋಣ!
  • ರಂಗನಾಥಜ್ಜ ಮೈಸೂರಿಗೆ ಹೊರಟರು
  • ಡಾ. ಆಚಾರ್ಯರು ಈಗಷ್ಟೆ ಫೋನ್ ಕರೆಯನ್ನು ಅವರೇ ಸ್ವೀಕರಿಸುತ್ತಿಲ್ಲ
  • An effective Climate Action Plan for Karnataka
  • ಗೂಗಲ್+ : ಅಂತರಜಾಲದ +ಟಿವ್ ಚೇಂಜ್!
  • ‘ಇಜ್ಞಾನ’ ಸಂಚಿಕೆ ಓದಿ
  • ಮಾಧ್ಯಮ ಮಿತ್ರರಿಗೆ ಮಾಹಿತಿ ಹಕ್ಕು ಕೈಪಿಡಿ
  • ಸ್ಟೀವ್‌ ಜಾಬ್ಸ್‌ ಕಟ್ಟಿದ ಹಂಗಿನರಮನೆಯಲ್ಲೇ ಇರಬೇಕೆ?
  • ಸೂರ್ಯನ ತೂಕದ ಸಾಸಿವೆ ಕಾಳಿನ ಸುತ್ತ ವಜ್ರಕಾಯ ಗ್ರಹದ ಗಿರಿಗಿಟ್ಲೆ : ಒಂದಷ್ಟು ಚರ್ಚಿಸೋಣ ಬನ್ನಿ….
  • ಸ್ಲೇಟು-ಬಳಪದ ಹೊಸ ಯುಗಕ್ಕೆ ಸ್ವಾಗತ !
  • ಬಾಳೇಪುಣಿ : ಅಭ್ಯುದಯ ಪತ್ರಿಕೋದ್ಯಮದ ಕಣ್ಮಣಿ
  • ನಮ್ಮ ಜಸ್ಟಿನ್ ಈಗ್ಲೂ ಫಾಸ್ಟ್
  • ಎಸೆಸೆಲ್ಸಿಗೆ ಬರೆದ ರಸಾಯನ ಶಾಸ್ತ್ರದ ಹಳೆ ಪುಸ್ತಕ ಹೀಗಿದೆ!
  • THE ANONYMOUS : ಬಿ. ದೇವರಾಜ್ ಹೊಸ ಕಲಾಕೃತಿಗಳ ಸರಣಿ
  • ಏನ್ಮಾಡ್ತೀರಾ ತರಲೆ, ಬದುಕುಳಿಯೋದೇ ಜಿರಲೆ !
  • ಸಹಕಾರ ಚಳವಳಿ : ಒಂದು `ಹೊರ’ನೋಟ
  • ಎಸ್ ಎಂ ಪೆಜತಾಯ: ಎಂಡೋ ಸಲ್ಫಾನ್ ಅಂದು ನಮ್ಮ ಮುಖದ ಮೇಲೆ ಕೊಟ್ಟ ಒದೆಯ ನೆನಪು!
  • OPEN LETTER to Jairam Ramesh: Nuclear power park to be set up in Jaitapur, in Maharashtra’s Ratnagiri district within WGs
  • ಬಿಟಿ, ಕುಲಾಂತರಿ : ಹೋರಾಟ ಇನ್ನೂ ಇದೇರಿ! ಕರ್ನಾಟಕದಲ್ಲಿ ಮತ್ತೆ ವಕ್ಕರಿಸಿದೇರಿ!!
  • Towards a sustainable power policy in Karnataka
  • ವಿಷಕಾರಿ, ಇಂಧನಬಾಕ ಮನುಕುಲ ಇನ್ನೆಷ್ಟು ದಿನ? ಬಂದೀತೆ ಸರಳ ಬದುಕಿನ ಸುಂದರ ಕ್ಷಣ?
  • ಟೆಕ್ಸ್ ಗುರು ರಾಧಾಕೃಷ್ಣನ್ : ನದೀಕಣಿವೆಯ ಫ್ರೀ ಸಾಫ್ಟ್‌ವೇರ್ ಸಂತ
  • ಟೆಕ್ಸ್: ಡೊನಾಲ್ಡ್ ಕನೂಥ್‌ನ ಸಂಶೋಧನೆ, ರಾಧಾಕೃಷ್ಣನ್ ಬದುಕಿಗೇ ಮರುಚಾಲನೆ
  • ಉತ್ತರ ಕೊರಿಯಾ : ಸಂಗ್ ಕಂಡ ಉತ್ತರ ಕೊರಿಯಾ ಮತ್ತು ಅದರ ಸರ್ವಾಧಿಕಾರಿ
  • ಎಂಡೋಸಲ್ಫಾನ್ ನಿಷೇಧದ ಜಾಗತಿಕ ನಿರ್ಧಾರಕ್ಕೆ `ಉತ್ಪಾದಕ’ ಭಾರತದ್ದೇ ವಿರೋಧ
  • ಡರ್ಟಿ ನ್ಯೂಸ್: ಕೊಳಕು ಡಜನ್ ವಿಷಪಟ್ಟಿಗೆ ೯ ಹೊಸ ಅರಿಷ್ಟಗಳ ಸೇರ್ಪಡೆ
  • ಧರಂಪಾಲ್: ಬ್ರಿಟಿಶರಿಗೆ ಭಾರತವೇ ಮಾದರಿಯಾಗಿತ್ತು ಎಂಬ ಸತ್ಯವನ್ನು ಶೋಧಿಸಿದ ಗಾಂಧಿವಾದಿ
  • Devinder Sharma: Gutter Science: Inter-Academy Report On GM Crops
  • Devinder Sharma: Punjab middlemen get Rs 7,830 million a year for practically doing nothing
  • ಉಮರನ ಬದುಕಿನಲ್ಲಿ ಒಸಗೆಯಷ್ಟೇ ಅಲ್ಲ…
  • ಅಗಣಿತ ಮಹಿಮರಿಗೆ ನಮೋನ್ನಮಃ: ವಿಶೇಷ ವ್ಯಕ್ತಿತ್ವಗಳನ್ನು ಅರಿಯೋಣ ಬನ್ನಿ!
  • ಬಿಟಿ ಬದನೆ: ಆರು ರಾಷ್ಟ್ರೀಯ ವಿಜ್ಞಾನ ಸಂಸ್ಥೆಗಳು, ೯೦ ಜನ ವಿಜ್ಞಾನಿಗಳು ತಯಾರಿಸಿದ ನಕಲು ವರದಿಯ ಕಥೆ
  • ‘ಕವಲು’ ಮೂರನೇ ದರ್ಜೆ ಕಾದಂಬರಿ : ಸಾರಾ ಅಬೂಬಕರ್
  • ಉತ್ತರ ಕೊರಿಯಾ: ಅಣ್ವಸ್ತ್ರದ ಮಹಾಕೋಠಿ
  • ಉತ್ತರ ಕೊರಿಯಾ: ಸರ್ವಾಧಿಕಾರಿಗೆ ದುಡಿದು ಸಾಯುವ ಖೈದಿಗಳ ನರಕ
  • ಹಸಿದ ಹೊಟ್ಟೆಯ ಮೇಲೆ ೭೦೦೦ ಮರ್ಸಿಡಿಜ್ ಬೆಂಝ್‌ಗಳ ಸವಾರಿ
  • ಗಡ್ಕರಿ ರಶ್ಯಾ ಭೇಟಿಯಲ್ಲಿ ಏನಾಯ್ತು?
  • ವೇದಾಂತ : ಅಗೆದಷ್ಟೂ ಅವಾಂತರ
  • Shankar Sharma: A way out of Power Crisis
  • ಕಂಬಳಿಹುಳದ ಕಡಿತ: ಉರಿಗಿಲ್ಲ ರಿಯಾಯ್ತಿ !
  • ತುಂಟ ಸಿದ್ಧಾರ್ಥನ ಕಲಾಕೃತಿಗಳು
  • Shankar Sharma: Electricity supply management – Lessons from Kerala
  • ಉಮೇಶ : ಜೀತ ವಿಮುಕ್ತಿ ಹೋರಾಟದ ಯುವ ಶಕ್ತಿ
  • Future Electricity Supply Options for India
  • How essential is the nuclear power option for India?
  • ನಾವು ಹಾಲಿವುಡ್ ಸಿನೆಮಾ ಯಾಕೆ ನೋಡಬೇಕು?
  • ನಿರುದ್ಯೋಗ ಪರ್ವದ ಒಂದು ವರ್ಷ : ಶ್ರುತಿ ಸೇರದ ಜಾಡು
  • ಏನೋ ಮಸ್ಕಿ, ಸಹಕಾರ ಭಾರತಿ ಅಂದ್ರೆ ನಿಂಗೆ ಟಿಶ್ಯೂ ಪೇಪರ್ರಾ?
  • ಅಸಲಿಗೆ, ಈ ಸುಶೀಲ್ ಮಂತ್ರಿ ಯಾರು?
  • ಕತ್ತಲೆ – ದಾರಿ ಹತ್ತಿರ: ವಿದ್ಯುತ್ ಸಮಸ್ಯೆ ನೀಗಿಸಲು ಮಿತ್ರಮಾಧ್ಯಮದಿಂದ ಮಾಹಿತಿಪೂರ್ಣ ಪುಸ್ತಕ
  • Impact of Electric Power Sector on Western Ghats : Issues and remedies
  • ತದಡಿಯಲ್ಲಿ ಅನಿಲ ಆಧಾರಿತ ವಿದ್ಯುತ್ ಯೋಜನೆ ಬೇಡ
  • ಮಿತ್ರಮಾಧ್ಯಮದಲ್ಲಿ ವಿದ್ಯುತ್ ತಜ್ಞ ಶಂಕರ್ ಶರ್ಮ ಅಂಕಣ
  • Media Fest Presentation by Beluru Sudarshana
  • ಬಿಟಿ ಶಾಂತಾರಾಮ್‌ರವರಿಗೆ ನಾಟಿ ನಮಸ್ಕಾರಗಳು!
  • ಶಾಂತಾರಾಂ, ಚಪ್ಪಲಿ ಎಲ್ಲಿ ಕಚ್ಚುತ್ತದೆ ಎಂದು ಹೇಳಬಾರದೆ?
  • ದೇವಿಂದರ್ ಶರ್ಮ : Call for a moratorium on GM Foods
  • ಮಿತ್ರಮಾಧ್ಯಮದಲ್ಲಿ ದೇವಿಂದರ್ ಶರ್ಮ ಲೇಖನಗಳ ಪ್ರಕಟಣೆ ಆರಂಭ
  • ಬಿಟಿ ಬದನೆ ರಗಳೆ, ಡಾ. ಶಾಂತಾರಾಂ ಬೊಗಳೆ!
  • ಇಂಟರ್‌ನೆಟ್ ಎಂಬ ನ್ಯೂ ಮೀಡಿಯಾ: ನನ್ನ ಹಳೇ ಸಂದರ್ಶನ ಇಲ್ಲಿದೆ!
  • ನನ್ನ ಒಂದ್ನೇ ಕ್ಲಾಸ್ ಶಾಲೆ : ಹೊಡಬಟ್ಟೆಯ ಮಧುರ ನೆನಪು
  • ಪ್ರವಾಸದಲ್ಲಿ ಕಂಡ ದತ್ತಾಜಿ ಅಮ್ಮ
  • ‘ದಿ ಮಿಶನ್’: ಜಲಪಾತ ಕಟ್ಟಿಕೊಡುವ ಅದ್ಭುತ ಕಥನ
  • ಓಮರ್ ಮುಖ್ತರ್ : ನೈಜ ಜೆಹಾದಿ ಅರಿಯಲು ಈ ಸಿನೆಮಾ ನೋಡಿ !
  • ಎಂಡೋಸಲ್ಪಾನ್ ರುದ್ರನರ್ತನಕ್ಕೆ ಭಾರತದ್ದೇ ಹಿಮ್ಮೇಳ
  • ವಿಶಿಷ್ಟ ಅನುಭವಕ್ಕೆ ಒಡ್ಡುವ `ಕಾಗದದ ದೋಣಿ’ಯ ಯಾನ
  • ಕಣ್ಮರೆಯಾದ ಖಾಸಗಿತನಕ್ಕೆ ಅಳೋರಾರು?
  • ‘ಹಸಿರು ಕ್ರಾಂತಿಗೆ ಭಾರೀ ಬೆಲೆ ತೆತ್ತಿದ್ದೇವೆ’
  • ಹಸಿರು ಕ್ರಾಂತಿಯ ಕೊಡುಗೆ: ಕ್ಯಾನ್ಸರ್ ಟ್ರೈನ್
  • ದಿ ಕಿಲ್ಲಿಂಗ್ ಫೀಲ್ಡ್ಸ್ : ಕಮ್ಯುನಿಸಂನ ಕರಾಳಮುಖಕ್ಕೆ ಹಿಡಿದ ಕನ್ನಡಿ
  • ಹಸಿರು ಕ್ರಾಂತಿ : ಬರೀ ಪೊಳ್ಳು, ಭ್ರಾಂತಿ !
  • ದಶಕದ ಗೇಮ್‌ಪ್ಲಾನ್‌ಗೆ ಚೀನಾ ಷಡ್ಯಂತ್ರ (ಸರಣಿ ಲೇಖನ ೪)
  • ಚೀನಾದಲ್ಲಿ ಮಾತ್ರ: ‘ಲಾಗೋಯ್’ – ೨೧ನೇ ಶತಮಾನದ ನರಕ (ಸರಣಿ ಲೇಖನ ೩)
  • ಚೀನಾ: ಸುಳ್ಳು, ಗೌಪ್ಯತೆಯೇ ಶಕ್ತಿ, ಯುಕ್ತಿ ( ಚೀನಾ ಸರಣಿ ಲೇಖನ ೨)
  • ಹಾಯ್ ಹಾಯ್ ಚೀನಾ ! (ಸರಣಿ ಲೇಖನ ೧)
  • ನೇಪಾಳ:ಪಶುಪತಿನಾಥ ಕೇವಲ ನಿಮಿತ್ತ ; ಮರುಕಳಿಸಲಿದೆಯೆ ರಕ್ತಪಾತ ?
  • ವಿಶ್ವ ಪರಂಪರೆ ತಾಣವಾಗಲಿದೆ ಪಶ್ಚಿಮ ಘಟ್ಟ. ಬೃಹತ್ ಯೋಜನೆಗಳನ್ನು ದಯವಿಟ್ಟು ಕೈಬಿಡಿ !
  • ತದಡಿ : ಆಗ ಪೆಡಂಭೂತ, ಈಗ ಬ್ರಹ್ಮಪಿಶಾಚಿ !
  • ನಿಮಗೆ ಗೊತ್ತೆ, ಬ್ಯಾಕ್ಟೀರಿಯಾ ಅರಿಷಡ್ವರ್ಗ?
  • Three Cups of Tea : ಮನ ತಟ್ಟುವ ಸೇವಾ ಕಥನ
  • Please visit www.mitramaadhyama.co.in
  • Shilpashree Investigative Report Award 2010
  • “ನೋಯಿಂಗ್” : ನಿಕೋಲಾಸ್ ಕೇಜ್ ನ ಬತ್ತದ ಉತ್ಸಾಹ
  • ಜಯಚಿಕ್ಕಿ ಕೊಟ್ಟ ಮನೆಮದ್ದಿನ ಪುಸ್ತಕಗಳು : ನೀವೂ ಓದಿ
  • ದಿ ವಿನ್ನರ್ ಸ್ಟಾಂಡ್ಸ್ ಅಲೋನ್: ಪಾಲೋ ಕೊಯೆಲ್ಹೋನ ವೈಚಾರಿಕ ಥ್ರಿಲ್ಲರ್
  • ಒಂದು ಮುಷ್ಟಿ ನಕ್ಷತ್ರ: ರಾಜಲಕ್ಷ್ಮಿಯ ಖಾಸಾ ಅನುಭವದ ಕಥೆಗಳು
  • ಸಂಗೀತದ ಕ್ಲಾಸಿನ ನಂತರ ಚಾ ಕೊಟ್ಟ ಜೀವಗಳು
  • ಪಾಕಿಸ್ತಾನಿ ಗಝಲ್‌ಗಳ ಖಜಾನೆ
  • ನನ್ನ ಮೇಡಂ ಜಯಲಕ್ಷ್ಮಿ
  • ಹನುಮನಹಳ್ಳಿಯ ಸುಗಂಧ
  • ಮನೋಹರ ಮಸ್ಕಿ, ಅರೆ ಇಸ್ಕಿ! ಸಂವಿಧಾನ ಶಿಲ್ಪಿಗೇ ಅವಮಾನ ಮಾಡ್ತೀಯ?
  • ನನ್ನ ಪ್ರೀತಿಯ ದತ್ತಾಜಿ
  • ಮನೋಹರ ಮಸ್ಕಿ: ಖತರ್‌ನಾಕ್ ಸ್ಕೀಮ್‌ಗಳ ಸರದಾರ !
  • ಮನೋಹರ ಮಸ್ಕಿಯೂ… ೮೦ ಲಕ್ಷ ರೂ.ಗಳ ಸ್ಕೀಮೂ……
  • ರಂಗನಾಥರ ಬಹುಮುಖೀ ಬದುಕು
  • ಮಲ್ಲೇಶ್ವರದಲ್ಲಿ ಕಂಡ ರಂಗನಾಥ್: ಈಗ ಬರಿ ನೆನಪು
  • ನನ್ನ ಪ್ರಿಯ ಕೋಮಾರನಪುರ ರಂಗನಾಥ, ನಿಮ್ಮನ್ನೆ ನೆನಪಿಸಿಕೊಂಡು…..
  • ಪಬ್ ಮೇಲೆ ದಾಳಿ ಮಾಡಿ ಹುಡುಗೀರ್‍ಗೆ ಹೊಡೆದದ್ದು ತಪ್ಪು ತಪ್ಪು!
  • ನೋಡೋಸಮ್ ಷಣ್ಮುಖನಿಗೆ ನಮೋನ್ನಮಃ
  • ರಾಷ್ಟ್ರೀಯತೆಯ ಇಮೇಜ್ ಮ್ಯಾನೇಜರ್‌ಗಳು ಮತ್ತು ‘ಸ್ಲಮ್‌ಡಾಗ್’
  • ಸಾಜ್ ಮತ್ತು ಏಕ್ ನಯಾ ಸಾಜ್
  • Victory for hawkers, DNA bends its unique policy
  • DNA publishes a story against BENGALURU name
  • DNA says CM Yeddyurappa is a smoker and drinker
  • Double subscription: DNA executives go on record
  • DNA Bangalore Complaints – Subscribed news paper not delivered
  • Media support for fight against DNA
  • DNA executives cheat hawkers, try selling papers!!
  • An appeal from poor paper hawkers to the readers of DNA
  • DNA: Delayed , No Analysis?
  • ಟಿಬೆಟನ್ನು ಅಹಿಂಸೆಯ ನೆಲೆವೀಡಾಗಿಸಿ
  • ನಕ್ಸಲರು: ಸಾವಿನ ಸರದಾರನ ಕುರುಡು ಬಂಟರು
  • ಟಿಬೆಟ್: ಡಿಸೆಂಬರ್ ೧೦ರಂದು ವಿಶೇಷ ಲೇಖನ
  • ಮಾನನಷ್ಟ ಮೊಕದ್ದಮೆಯೂ, ಮುಳಬಾಗಿಲಿನ ಮುಖಗಳೂ…
  • DNA Bangalore : Double subscription attempts, no paper yet!!
  • ಸಿಲಿಕಾನ್ ಸಿಟಿಯೆಂಬ ಬುಡುಬುಡಿಕೆ ಬಿಡಿ
  • China: Latest Military Report
  • My new service: Downloadable files and softwares
  • My new service: Downloadable files and softwares
  • ಕಂದಿಹೋದ ಸಾಂಕೇತಿಕತೆಯ ಸಂಕೇತ: ಶಿಖರಸೂರ್ಯ
  • `ಗಂಡ ಹೆಂಡಿರ ನಡುವೆ’ : ಕೆಲವು ಉಪಯುಕ್ತ ಮಾಹಿತಿಗಾಗಿ ಓದಿ
  • ಒಂದು ಬದಿ ಕಡಲು: ಕಡಲು ಕಡೆದು ಬದುಕಿನ ಕೆನೆ ತೆಗೆದ ಕಥೆ
  • ಮಾಯಾಲೋಕಕ್ಕೆ `ತೇಜಸ್ವೀ’ ಪಯಣ
  • ಕೆ ಬ್ಲಾಕ್ ಅಂದ್ರೆ ಕೇತಮಾರನಹಳ್ಳಿ
  • ಭೈರಪ್ಪನವರ `ಆವರಣ’ ಬ್ಯಾನ್ ಆಗುತ್ತಂತೆ?
  • ಬ್ರೆಝಿಲ್ ಕಾಡಿನಲ್ಲಿ ಬರ್ನಾಂಡಿ
  • Develop Technology, Kill language, Government Style
  • Energy alternative from America
  • Privacy of Britons in America’s hand
  • The pain & Agony of Tibet
  • Kannada DiMdiMa
  • A request to mainstream papers
  • Raag Madhuvanti
  • Artist B. Devaraj: Bangalore’s heart spot
  • Mayaloka 1: Instant view
  • How to get unconditional apology letters from prestigious Banks
  • Vikranta Karnataka, a curtain raiser
  • Sopan, a STEP in right direction
  • World Bank comment on India
  • Cosmetics for life: Venkatesh from Botswana
  • Narayana Hegde Arasikeri, 83 still young
  • Hampi University’s new ventures
  • America’s draconian Space Policy
  • Chapter 1: Under the rainbow
  • Women who changed lives
  • Chandrashekhar Kambara: an interview
  • Twin cities of Bay of Cambay
  • Sex: Common habba of internet
  • Gimbel’s Hampi
  • ಕೆಲಸ ಬಿಟ್ರಾ , ವರಿ ಮಾಡ್ಕೋಬೇಡಿ | ಅಥ್ವಾ ಕೆಲ್ಸ ಬಿಡಿ ಖುಷಿ ಪಡಿ
  • Our Justin is very fast
  • Bisilu Kolu: A review
  • Why Sahitya Sammelana?
  • Early stories of Raghavendra Patil : A review
  • Battalike: A review
  • Anubhavave nudichitra
  • ಸಾಮರಸ್ಯದ ನೇಕಾರ : ಸಂತ ಕಬೀರ
  • ಕಲಿವ ತವಕ
  • Basics of Brindavani Saarang
  • Rhodes, Girish Karnad and Aparthied | `ವರ್ಣಭೇದ’ ನೀತಿನಿರೂಪಕನ `ಪ್ರತಿಷ್ಠಿತ’  ಸ್ಕಾಲರ್ ‌ಶಿಪ್ ಗೆದ್ದವರು
  • Free Software movement
  • Kannada SaapthahikagaLu: A speech text
  • Pluto OK, Bose illa yaake?
  • Booker and some sweat
ಹುಡುಕಿ!
ವಿಭಾಗಗಳು
  • Uncategorized (2)
  • ಉಚಿತ ಪುಸ್ತಕ ಸಂಸ್ಕೃತಿ (6)
  • ಒಳಗಣ್ಣು (ಟಿ ಎಸ್‌ ಶ್ರೀಧರ ಅಂಕಣ) (4)
  • ಕಲಿ ಯುಗ (62)
  • ಕವನಗಳು (131)
  • ನನ್ನ ಮಾಧ್ಯಮಯಾನ (3)
  • ಫ್ಲಿಪ್ ಪುಸ್ತಕಗಳು (1)
  • ಮಕ್ಕಳ ಪ್ರಬಂಧಗಳು (7)
  • ಮಾಹಿತಿ / ಲೇಖನ (22)
  • ಲೇಖನಗಳು (262)
  • ವಿಮರ್ಶೆ (49)
  • ಶಂಕರ್ ಶರ್ಮ (22)
  • ಸಣ್ಣ ಕಥೆಗಳು (20)
  • ಸುದ್ದಿ (152)
  • ಹಿಮದೊಡಲ ತಳಮಳ (1)
  • ಹುಲ್ಲಿನ ಸಾರು (1)
Archives
© 2025 ಬೇಳೂರುಸುದರ್ಶನ.

Type above and press Enter to search. Press Esc to cancel.